Dorland Geomatics Dorland Geomatics
  • Home
  • About
    • About Us
    • Clients & Associates
    • Projects
  • Services
    • Cadastral Surveys
    • Engineering Surveys
    • Archived Records
  • Locations
  • Contact Us
    • General Inquiry
    • Estimate Request
    • Careers

Mining Claim Reference Plan

A Mining Claim Reference Plan is required to register claims with provincial agencies.The plan must include the location of all traverses, outcrops investigated rock types, mineralization and trenches, a plan of sampling clearly identifying the location of each sample by number letter or grid coordinate designation, the character of the overburden, including boulders, clay, gravel and sand, the distribution of swamp, muskeg and forest cover areas along all lines traversed, lakes, streams and other topographic features.They may also include railways, roads, trails, power lines, pipelines and buildings, claim posts and boundary lines, township boundary lines, lot and concession lines, base lines, established survey lines if any and stations the mining claim lease patent or parcel numbers of all mining land covered by the survey.

Main Menu

  • Home
  • About
    • About Us
    • Clients & Associates
    • Projects
  • Services
    • Cadastral Surveys
    • Engineering Surveys
    • Archived Records
  • Locations
  • Contact Us
    • General Inquiry
    • Estimate Request
    • Careers

About

  • About Us
  • Clients & Associates
  • Projects

Services

  • Cadastral Surveys
  • Engineering Surveys
  • Archived Records

Contact Us

  • General Inquiry
  • Free Estimate
  • Careers

Social Media

  • Facebook
  • Instagram
  • LinkedIn
Copyright © 2026 Dorland Geomatics. All Rights Reserved.
Joomla! is Free Software released under the GNU General Public License.